General Airport & Surface Infrastructure Maintenance
There’s no better way to explain what LAML do, and how we do it, than with Client Case Studies.
General Airport & Surface Infrastructure Maintenance Case Studies
LAML deliver air-side, port-side and land-side maintenance projects in the UK and abroad.
Listed below are details of some of the key general airport and maintenance projects that the LAML team has undertaken.
If you’d like to learn more about any of our projects, please get in touch.
Glasgow Prestwick Airport - General Airport Maintenance
Glasgow Prestwick Airport engaged with LAML to review their existing asphalt and concrete infrastructure including undertaking a detailed runway survey. LAML proposed a 5-year maintenance plan for the client to enable them to prolong the life expectancy of their current infrastructure without having to commit major capital expenditure at this current point in time.
Bristol Airport Runway & Taxiway General Maintenance
Our client had a package of surface maintenance and patching repairs to be carried out over a period of 5 /6 shifts in March of 2021 and 2022.
LAML acted in the role of Principal Contractor and our Project Manager was closely involved prior to works commencing.